High Tunnel Site Preparation
Site preparation is key for high tunnels. High tunnels require a relatively straight and level site. I need a site that is level side to side and on a slope of not greater than 2-5%…
Site preparation is key for high tunnels. High tunnels require a relatively straight and level site. I need a site that is level side to side and on a slope of not greater than 2-5%…
Table grape production east of the Rocky Mountains is limited due to weather conditions, pests, diseases, and pests. These problems cause damaged fruits that must be culled by picking any damaged berries by hand. The…